Choosing the location
- Free airflow: the unit needs fresh air in and space to discharge cool air. Do not box it in or face the fan into a wall.
- Short pipe run to the tank to reduce heat loss and pump energy.
- Firm, level base: concrete plinth, steel frame or wall bracket rated for the unit weight (40–170 kg depending on model).
- Drainage: condensate and defrost water must drain away safely.
- Service access on the front and sides for the technician.
- Noise: keep the fan side away from bedrooms and neighbours' windows.
Roof-mounted and wall-mounted installations
Flat roofs are common for terrace houses, shoplots and commercial buildings. The unit is placed on a steel frame or concrete plinth with anti-vibration pads, and the roof waterproofing is protected. Check the roof can carry the unit and, if the tank is also on the roof, the full tank weight (a 500 L tank weighs over 600 kg full).
Smaller monoblock units can be wall-mounted on heavy-duty brackets, similar to an air-conditioner condenser. Use rubber isolation mounts to reduce vibration into the wall.
Pipework, buffer tank and controls
Water pipes between the heat pump and tank are insulated and sized for the minimum water flow (for example above 1.7 m³/h for a 10 kW unit). A strainer protects the plate heat exchanger, and a flow switch protects the unit if water stops.
A buffer tank is used when the heat pump serves fan coils, floor heating or several zones. It stores a volume of heated or chilled water so the compressor does not start and stop too often. Pecol supplies enamel-lined SHPBT buffer tanks from 150 to 500 L.
| Buffer tank | SHPBT-150 | SHPBT-200 | SHPBT-300 | SHPBT-400 | SHPBT-500 |
|---|---|---|---|---|---|
| Capacity | 150 L | 200 L | 300 L | 400 L | 500 L |
| Dimensions | Ø520 × 1275 | Ø580 × 1351 | Ø650 × 1500 | Ø710 × 1497 | Ø710 × 1971 |
8 bar max working pressure, enamel-coated inner tank, PU foam insulation. Optional 2 × 3 kW electric heaters.
Power supply
Domestic models run on 220–240V single phase; larger units need 380–415V three phase. Each unit needs a dedicated circuit, isolator and earth leakage protection, installed by a registered electrician. Pecol's DC inverter models start at low current, so they do not cause the light flicker or meter spike of a large electric heater.
Commissioning checklist
- Pressure testWater side checked for leaks; system flushed.
- Air purgeAir removed from pipes and heat exchanger.
- Electrical checksVoltage, earth and protection verified.
- Start-upFlow, temperatures, current and COP checked against specification.
- HandoverSet temperature, timers, WiFi app and user briefing.